• Hopewell-Loudon PK-12 School

    The Hopewell-Louden school is separated into high school and elementary school wings. In each of the wings, there are several cut-out areas, nooks where students
  • Beverly K-8 School

    The 91,728 sf Beverly K-8 School boasts more than 25 state-of-the-art classrooms equipped with visual display surfaces such as SmartBoards and ceiling-mounted projectors.  The gymnasium
  • University of Toledo Simulation Center

    The University of Toledo’s Interprofessional Immersive Simulation Center is using technology found nowhere else in the world. Here, students and practitioners get hands-on experience with procedures,
  • Riverside Elementary School

    Riverside Elementary houses kindergarten through grade 5.  Mosser’s contract for this 60,000 sf elementary school included all concrete and masonry work, with translucent light shelves at
  • Kenton Elementary School

    An exciting endeavor for Kenton City Schools, the PK-6 Elementary School includes fifty-three classrooms with large extended learning areas that are accessed by all
  • University of Toledo Simulation Center

      The University of Toledo’s Interprofessional Immersive Simulation Center is using technology found nowhere else in the world. Here, students and practitioners get hands-on experience with procedures,

Project Features

The University of Toledo’s $36 Million Interprofessional Immersive Simulation Center project consists of administration space and the Hillebrand Center which simulates medical cases for student training.

The first floor focuses on Virtual Immersion Reality (VIR) spaces which include virtual equipment and educational use, as well as, CAD walls and a holographic theater.  Some of this equipment will have the ability to reach other spoke sites on the main campus, other U.S. sites, and potentially around the world.

The second floor is primarily medical training related, such as student and industry training on simulation equipment related to nursing, surgical, and general training.  This area also emphasizes virtual and dry-lab spaces.

The third floor of the center includes the majority of the hands-on wet-lab training (wet labs are related to surgical skills and/or spaces with cadaver use.) The main focus of this floor is a large operating room which has ability to have multiple training functions for large or small groups.

The roof level will collect rainwater and funnel it into a harvesting collection system which will be reused to flush toilets.

It is this type of green technology that allows this project to pursue LEED Silver Certification.

  • UT Simulation Center - Atrium

    Healthcare

    UT Simulation Center
  • Higher Education

    BGSU Stroh Center
  • battery plant expansion

    Industrial Manufacturing/Warehouse Facilities

    battery plant expansion
  • Toledo Bay View Treatment Plant

    Water Treatment

    Toledo Bay View Treatment Plant
  • The Huntington Center

    Recreation

    the Huntington Center
  • Henry County Courthouse

    Renovation

    Henry County Courthouse
  • Office Buildings

    Fifth Third Bank
  • Highway Projects

    LORAIN COUNTY 1-90 INTERCHANGE
  • Retail

    Rave Cinema
  • Training Centers

    Penta Career Center
  • LEED Certified Projects

    UT PHARMACY, CHEMISTRY & LIFE SCIENCES COMPLEX
  • PK-12 Education

    Kenton City Schools

Pin It on Pinterest