Mosser Construction was contracted to build an addition and install an integrated membrane wastewater treatment plant system at the Bowling Green Water Treatment Plant.

Equipment installation included:

  • Microfiltration system equipment
  • Reverse osmosis equipment
  • Stainless steel, ductile iron, and PVC piping
  • Chemical Feed Systems

Location: Bowling Green, Ohio
Project Size: 6,200 sf