Mosser’s work on the 92,000 sf Vanguard-sentinel Career Center project included the removal of the entire roof, all of the acoustical ceiling, and over half of the floors.  Masonry walls were added, along with metal partition walls, electrical, plumbing, fire protection, and HVAC systems.  Mosser also installed acoustical ceilings, equipment in the kitchen area, educational casework, flooring, and roofing.

Unique project features Include:

      • Eight months of work was performed in a remarkable 12-week time span

Location: Fremont, Ohio
Project Size: 92,000 sf