Project Features

The salt and material storage structure has a salt capacity of 5,000 tons, increasing from 2,000 tons in their previous structure. The salt barn also includes a Brine Xtreme system for brine production with four 12,000 gallon storage tanks.

The facility has multiple amenities though out the site. Project features at the truck storage mechanics area include a one-ton monorail and a three-ton bridge crane with wireless remote controls. A forty-ton truck lift was installed and mobile column lifts for maintenance on trucks and equipment.  The mechanics bay is supplied with an auto lubrication system and welding bay. The entire building has a carbon monoxide detection system integrated with make-up air units, along with a complete facility generator.

  • CMP Schedule
  • 3,100 cy of concrete poured
  • UT Simulation Center - Atrium

    Healthcare

    UT Simulation Center
  • Higher Education

    BGSU University Hall Renovation
  • battery plant expansion

    Industrial Manufacturing/Warehouse Facilities

    battery plant expansion
  • Toledo Bay View Treatment Plant

    Water Treatment

    Toledo Bay View Treatment Plant
  • The Huntington Center

    Recreation

    the Huntington Center
  • Renovation

    Sandusky County Courthouse
  • Office Buildings

    Fifth Third Bank
  • Highway Projects

    LORAIN COUNTY 1-90 INTERCHANGE
  • Retail

    Rave Cinema
  • Training Centers

    Penta Career Center
  • LEED Certified Projects

    UT PHARMACY, CHEMISTRY & LIFE SCIENCES COMPLEX
  • PK-12 Education

    New Lorain High School

Pin It on Pinterest