-
Bowling Green Water Treatment Plant
Mosser Construction was contracted to build an addition and install an integrated membrane wastewater treatment plant system at the Bowling Green Water Treatment Plant. Equipment installation -
Fort Meigs Memorial Bridge
The Ohio Department of Transportation hired Mosser Construction to replace the existing bridge with a structure that would meet today’s needs for motorists, pedestrians, and -
Penta Career Center
Mosser Construction was the general trades prime contractor on this educational showcase where students from five counties and 16 school districts train for careers as -
Sacred Heart Home
The Little Sisters of the Poor Sacred Heart Home is truly a state-of-the-art facility that was designed for 75 full-time residents. The home offers three levels of -
Village of Rockford Wastewater Treatment Plant
The project entailed the construction of a new water treatment plant to replace the existing facility. Work consisted of an underground concrete detention tank, one-story