The project involved site work which included running new water, sewer, electric and gas utilities to the building and grading of the site to prepare the area for the construction of the new building.

Mosser installed concrete foundations and grade beams for the pre-engineered metal building. Mosser also constructed the 7′-4″ high CMU walls around the exterior of the building. One bay of the building is a 25′ x 85′ office area with 11′-0″ high CMU walls which support bar joist, metal deck and a concrete floor above the office to create a mezzanine area for storage. The next three bays of the building are open for the truck maintenance shop area. The last bay is a wash bay and is enclosed with a metal liner panel. 8″ concrete floors with steel fiber reinforcing were installed in the shop and wash bay areas. Since this is a truck maintenance facility that will repair diesel and compressed natural gas (CNG) vehicles there is a special gas detection system that was needed in this facility that will set off the fire alarm, open the overhead doors and turn the main exhaust fan on high to remove the gas from the building.

      Location:  Findlay,

  • UT Simulation Center - Atrium

    Healthcare

    UT Simulation Center
  • Higher Education

    BGSU University Hall Renovation
  • battery plant expansion

    Industrial Manufacturing/Warehouse Facilities

    battery plant expansion
  • Toledo Bay View Treatment Plant

    Water Treatment

    Toledo Bay View Treatment Plant
  • The Huntington Center

    Recreation

    the Huntington Center
  • Renovation

    Sandusky County Courthouse
  • Office Buildings

    Fifth Third Bank
  • Highway Projects

    LORAIN COUNTY 1-90 INTERCHANGE
  • Retail

    Rave Cinema
  • Training Centers

    Penta Career Center
  • LEED Certified Projects

    UT PHARMACY, CHEMISTRY & LIFE SCIENCES COMPLEX
  • PK-12 Education

    New Lorain High School

Pin It on Pinterest