Daimler Chrysler: Cross-dock Terminal

Toledo, Ohio


Daimler Chrysler hired Mosser Construction to design and build this 100,000 sf pre-engineered CECO building that is being used as a cross-dock terminal servicing their production facility.

  • Extensive site development accomplished in adverse weather conditions
  • Fast-track schedule allowed this project to be completed in 180 days